Mining intelligence · Liberia 🇱🇷 / China 🇨🇳
China Union’s Bong Mines
Who can use the railway and export jetty, how much ore is moving, and what does Liberia earn?
· Bong County to the Freeport of Monrovia
Assessment
Liberia’s 2009 agreement with China Union covers iron ore development in Bong County and the railway and jetty needed to reach ocean buyers. LEITI lists a US$2.6 billion investment figure for the concession. The available records reviewed here do not establish how much of that investment was spent. In January 2026, China’s ambassador inspected the production lines and port area. The visit confirms activity at the project site and leaves mine output and export volumes open. [1] [2] [8]
Production and shipments
| Period | Evidence | What the record establishes |
|---|---|---|
| Feb 2014 | First cargo of about 50,000 metric tonnes [3] | One shipment, reported by Liberia’s Sustainable Development Institute. |
| 2015 | 60,000–90,000 metric tonnes per month [4] | Company-reported output range cited by USGS. An annual total cannot be derived from the range. |
| Aug–Sep 2024 | EPA shutdown followed by a three-month conditional reprieve [6] | Reuters reported that the EPA cited effluent licensing, plant permitting and tailings discharge. The current permit status remains open. |
| Jan 2026 | Diplomatic visit and inspection of facilities [8] | The visit statement gives no tonnage. |
| 2026 through 19 Nov | Mine-level production and exports unverified | Match monthly plant returns and stockpile movements to rail waybills and port manifests. |
From Bong County to the Freeport
- Bong MinesIron ore extraction and processing in Fuamah District.
- Bong Mine RailwayLegacy rail link between the concession and Monrovia.
- Freeport of MonroviaFormer Bong Mining Company export jetty.
Schematic route based on the project’s environmental and social impact assessment. [10]
Who can use the corridor?
Sections 6.6–6.7 give the concessionaire rights to develop, operate and maintain the rail and port facilities. Liberia can authorize third-party use of spare capacity when the concessionaire confirms it exists and the use would avoid unreasonable interference with mine operations. Commercial and technical terms require agreement among the parties. ResourceContracts summarizes the original rail renovation target at 12 million tonnes of concentrate per year. Actual capacity remains unverified. [1]
In January 2026, the Ministry of Transport reported talks with China Union and charcoal sellers over safe community freight access. The proposed arrangement concerned local freight. Commercial access for other mining companies would require its own evidence, such as an access agreement and published tariffs. [9]
What Liberia is owed and what it recorded
Contract royalty by index price
Bar scale 0–5% · Index price per metric tonne
FY2023 payment reconciliation
Bar scale US$0–6 million · LEITI §6
| Payment | Terms | Record to check |
|---|---|---|
| Concession payment | US$40 million in two US$20 million installments [1] | Treasury receipts for each installment. |
| Community contribution | US$3.5 million annually under §8.2 [1] [2] | County allocations, actual transfers and project expenditures. |
| Surface rent | US$100,000 annually for the first 10 years and US$250,000 annually for the next 15, as summarized by LEITI. [2] | Billing periods, receipts and applicable amendments. |
| Export royalties | Price-linked rates shown above. [1] | Shipment volumes, valuation and assessments by cargo. |
Employment and local benefits
Liberian management targets
Bar scale 0–100% · Share of positions
What has been reported
China’s ambassador cited 560 Liberian nationals employed by the project in January 2026. The statement provides no management breakdown. [8]
In November 2025, Liberia’s Mines Ministry reported an MOU covering priority rehiring of redundant workers, training, housing talks and rehabilitation of Bong Mines Hospital. Completion requires follow-up with the ministry and the United Workers Union of Liberia. [7]
Video from Bong Mines
Records to track next
Production and export volumes
Request mine returns by month, ore grade, dry tonnes of concentrate, inventory changes, rail dispatches and vessel manifests. A cargo may include material processed in a prior month.
Rail capacity and berth access
Request the capacity study, published tariffs, dispatch rules, third-party applications and access agreements from the transport authorities, National Port Authority and concessionaire.
Payments, jobs and environmental compliance
Request a royalty ledger and county transfer statements, the workforce by nationality and job grade, MOU implementation records and the EPA’s current permits and inspection findings.
Sources
- 2009 Mineral Development Agreement and clause index
- LEITI contract matrix, Bong County
- Sustainable Development Institute, Bong Mines case study
- USGS, The Mineral Industry of Liberia in 2015
- LEITI 16th report, FY2023, sections 6 and 7
- Reuters, EPA shutdown and conditional reprieve
- Liberia Ministry of Mines and Energy, November 2025 MOU
- Chinese Ministry of Foreign Affairs, January 2026 site visit
- Liberia Ministry of Transport, January 2026 corridor dispute
- Bong Mine environmental and social impact assessment, mine, port and rail

