panafrican.email

Unifying Africa Through Email

Install Messenger

Open Panafrican Messenger in your browser.

iPhone: In Safari, tap Share, then Add to Home Screen. Turn on Open as Web App if shown.

Android: In Chrome, tap the menu, then Add to Home screen. Choose Install if available.

🌐   LIVE

Editorial illustration pairing the New York Stock Exchange façade with a mining landscape inspired by Morelos, Mexico

🇲🇽 Torex Resources Debuts on the NYSE Under TXR

PANAFRICAN.EMAIL

Intelligence assessment / Mexico mining

Torex Resources lists on the NYSE

The Canadian miner now trades as TXR in New York and Toronto. Its operating base remains the Morelos gold, copper and silver complex in Guerrero, Mexico.

Torex Resources photograph from its Morelos operations page
Morelos Complex, Guerrero · Torex Resources [6]

Capital markets

What the listing changes

Torex began trading on the New York Stock Exchange at the November 17 open. Toronto remains its primary listing, with shares trading in Canadian dollars under the same ticker. The NYSE listing used existing shares and raised no capital. U.S. over-the-counter quotation under TORXF ended when NYSE trading began. [1]

  1. 3 Nov 2026Toronto ticker changes from TXG to TXR following the corporate name change.
  2. 13 Nov 2026SEC makes the exchange registration effective.
  3. 17 Nov 2026NYSE trading opens under TXR and replaces OTCQX quotation.

Assessment. The listing gives U.S. investors an exchange-traded route to the shares. Management expects wider access and potential liquidity gains. Trading volumes and spreads after the debut will show whether liquidity improves. [1] [2] [3]

Morelos operating performance

The business behind TXR

Morelos includes Media Luna and El Limón Guajes (ELG) Underground. In Q3, Torex attributed stronger production to higher processed grades and improved gold recovery. Gold recovery rose from 85.4% in Q2 to 88.2% in Q3 while plant throughput stayed broadly flat. These results predate the NYSE debut. [4] [5]

131,900 oz

Q3 gold-equivalent production

Includes 98,685 oz of gold and silver and copper converted using period prices. [4]

16.3m lb

Q3 copper produced

Physical copper output, before payable deductions. Also included in the gold-equivalent figure. [4]

US$150.4m

Q3 free cash flow

Company-defined non-GAAP measure. Quarter-end cash and equivalents were US$225.9m. [4]

Morelos mill throughput

Average tonnes of ore processed per day

Morelos mill throughputThroughput recovered from 10,492 tonnes per day in Q1 2026 to 10,798 in Q3, above design.10,00010,40010,80011,20011,600Q3 ’25Q4 ’25Q1 ’26Q2 ’26Q3 ’26
The dashed line marks the 10,600 t/day design rate. The vertical scale starts at 10,000 t/day to show variation around design. [5]

Quarterly revenue

Torex Resources · US$ million

Quarterly Torex revenueQuarterly revenue rose from 406.9 million US dollars in Q2 2026 to 555 million in Q3.0150300450600Q3 ’25Q4 ’25Q1 ’26Q2 ’26Q3 ’26416.4465.3539.3406.9555.0
Revenue reached US$555.0m in Q3 2026, up about 36% from Q2. Five quarters of issuer-reported, unaudited data. [3]
View chart data
Quarterly operating and financial data
QuarterMill throughput (t/day)Design (t/day)Revenue (US$m)
Q3 ’2511,30410,600416.4
Q4 ’2510,70510,600465.3
Q1 ’2610,49210,600539.3
Q2 ’2610,79310,600406.9
Q3 ’2610,79810,600555.0

Mexico and United States

Where Torex operates and explores

Asset portfolio by stage [3] [6]
AssetLocationStage and role
Morelos ComplexGuerrero, MexicoOperating gold, copper and silver complex. Media Luna North is a development project within the complex.
Los ReyesSinaloa, MexicoOwned gold-silver project. Preliminary economic assessment released in July 2026. Prefeasibility work is underway.
Batopilas, Guigui and La GloriaChihuahua and Sonora, MexicoEarly-stage exploration projects.
Medicine SpringsNevada, United StatesOwned exploration project.
Gryphon SummitNevada, United StatesOption to acquire the project.

Monitoring priorities

What to watch next

Trading liquidity

Track NYSE volume, spreads and U.S. institutional ownership filings as they become available.

Media Luna North

Torex targeted first ore by year-end 2026. Watch for confirmation and subsequent contributions to mill feed. [4]

Morelos and Los Reyes

Torex expects mill debottlenecking work to start in 2027. At Los Reyes, watch the prefeasibility study for changes to costs, mine design and schedule. [4]

Video

From the trading floor to Media Luna

NYSE TV · 17 November 2026

Torex rings the Opening Bell

The exchange’s official replay of the listing ceremony.

Watch the NYSE replay

Underground at Media Luna

Footage from equipment supplier MacLean Engineering, October 2025. Watch on YouTube.

Source notes

Sources and methodology

The exchange certification, SEC order and issuer announcement establish the listing timeline. Operating data come from Torex’s Q3 disclosures. The charts show historical operations and financial results. Project milestones remain company targets until completion is reported.

  1. Torex commencement announcement · SEC-filed exhibit, 17 Nov 2026.
  2. NYSE listing certification · 10 Nov 2026. SEC effectiveness order · 13 Nov 2026.
  3. Torex Q3 2026 management discussion and analysis · Company overview, operations and quarterly results.
  4. Torex Q3 2026 results release · 4 Nov 2026.
  5. Torex Q3 2026 earnings presentation · Morelos processing chart, page 7.
  6. Torex Morelos operations page · Site overview and lead photograph.
PANAFRICAN.EMAIL · Mining intelligence · 19 November 2026

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!

Discover more from panafrican.email

Subscribe now to keep reading and get access to the full archive.

Continue reading