Intelligence assessment / Brazil mining
Resouro moves equipment to Novo Mundo
The Luizão gold trial could eventually help fund Tiros, Resouro’s titanium and rare earths project. Bulk-sample results will inform the commercial production decision.
Company-reported mobilisationNovo Mundo gold project
What changed
Resouro Strategic Metals said it moved mobile mining equipment to Luizão in November and began clearing and stripping the existing pit. The proposed trial would send gold-bearing material to Buriti Gold Mineração’s existing plant in the Peixoto de Azevedo district. Trial mining is conditional on operational readiness. [1]
Project footprint
Three contiguous mineral titles, as reported in the November release. [1]
Trial extraction limit
Company-reported maximum under the extended trial authorization. Actual output will depend on the operating plan. [2]
Preliminary mining plan
The existing Luizão/Cláudio pit and two proposed pits at Raimunda and Modesto. [1]
Assessment. The mobilization report comes from Resouro. Independent site verification and bulk-sample results remain outstanding.
Operating sequence
From site preparation to a decision
- Mobilize equipmentSite preparation reported in November
- Start trial extractionOperational requirements pending
- Process bulk materialMeasure recovered grade, recovery and throughput
- Assess commercial miningDecision follows bulk-sample results
| Title / instrument | Filing or action | Status in company disclosures |
|---|---|---|
| 866.035/2009 · trial authorization (GU 20/2022) | 26 Apr 2026 · extension approved | Resouro reported a three-year extension and a 4,000 tonnes/month ceiling. Trial start remains conditional. [2] |
| 866.035/2009 · long-term mining concession | 16 Jul 2026 · application and development plan filed | Under review in the November update. [1] [3] |
| 866.320/2018 · Nivaldo 866.171/2018 · Mineiro | 28 Jul 2026 · final exploration reports filed | Awaiting ANM approval in the November update. [1] |
| Luizão environmental work | Initial environmental authorization reported | Additional studies, impact assessment and permitting underway, according to Resouro. [1] |
Project economics
How Novo Mundo could help fund Tiros
Buriti Gold Mineração (BGM) funds capital and operating costs for the Luizão program under approved budgets and cost-recovery terms. ISON, Resouro’s Brazilian subsidiary, receives a contractual share of net profit after allowable deductions. Any contribution to Tiros depends on whether the gold program generates distributable profit and how Resouro allocates it. [1] [2]
Luizão net-profit split
Share of contractual net profit (%)
- ISON / Resouro subsidiary
- BGM / operating partner
Tiros price sensitivity
Modeled post-tax NPV at an 8% discount rate (US$ million)
- Rare earth oxide basket
- Titanium dioxide prices
View chart data
| Price change | Rare earths | Titanium dioxide |
|---|---|---|
| -40% | 283.2 | 544.3 |
| -30% | 390.6 | 587.0 |
| -20% | 498.7 | 629.6 |
| -10% | 606.8 | 672.3 |
| 0% | 714.9 | 714.9 |
| +10% | 823.0 | 757.5 |
| +20% | 931.1 | 800.2 |
| +30% | 1,039.2 | 842.8 |
| +40% | 1,147.3 | 885.4 |
Next evidence to watch. Trial start, tonnes hauled and processed, recovered gold grade, plant recovery, and actual haulage and treatment costs will help establish unit economics. An ANM concession decision and disclosure of actual profit distributions would clarify the commercial and funding outlook.
Multimedia
Management interview
How Resouro plans to develop Tiros
Christopher Eager discusses the Tiros study with The Unicorns Podcast. The interview predates the November Novo Mundo update. Watch on YouTube.
Source notes
Sources and methodology
The operational and regulatory timeline reflects issuer disclosures through the 18 November release. The sensitivity graph uses the issuer’s published Tiros study scenarios, which model a separate project in Minas Gerais.
- Resouro Advances Trial Mining at Novo Mundo · Issuer release, 18 Nov 2026.
- Resouro Executes Binding Mining and Processing Agreement for Novo Mundo · Exchange announcement, 1–2 Jun 2026.
- Novo Mundo Mining Concession Application and Project Update · Issuer release, 23 Jul 2026 ET.
- Tiros preliminary economic assessment · Issuer release, June 2026. Cost summary and sensitivity table.


Leave a Reply